54-56 High Street Trumpington

Project: 54-56 High Street Trumpington
Contract Value: £1.8million
Client: Trumpington Enterprises
Consultant: Bidwells
Form of Contract: Traditional with M&E CDP
Contract Period: 52 weeks

Description: Conversion of a storage building into a new fully fitted kitchen and set of dining halls. Archaeological investigations, asbestos surveys, a brick study and timber rot surveys were undertaken to aid the design process. The works included demolition of the internal structure, new partitions & ceilings, new finishes, internal doors, external windows and doors, re-roofing and a full mechanical and electrical installation.

Downing College

Client: Master, Fellows and Scholars of Downing College
Consultant: Robert Lombardelli Partnership LTD
Contract Period: 10 weeks

Description: The project involved the refurbishment of the library toilets at Downing College to modernise and upgrade the facilities while ensuring compliance with contemporary building standards.

Key works included:

-Preliminaries & Site Management – Coordination, health & safety measures, and protection of existing areas.

-Alterations & Structural Modifications – Removal and modification of walls, doors, and existing finishes to accommodate the new design.

-Finishes & Fixtures – Installation of new flooring, wall finishes, painting, and upgraded sanitary fixtures.

-Mechanical & Electrical Works – Plumbing upgrades, electrical installations, lighting enhancements, and ventilation improvements.

The project successfully improved the aesthetics, functionality, and efficiency of the library’s restroom facilities while adhering to Downing College’s quality and design standards.

Jesus College

Project: The Forum Jesus College
Contract Value: £1.7 million
Client: Jesus College Cambridge
Consultant: Northmores
Form of Contract: JCT Design & Build 2016
Contract Period: 35 weeks

Description: Conversion of a storage building into a new fully fitted kitchen and set of dining halls. Archaeological investigations, asbestos surveys, a brick study and timber rot surveys were undertaken to aid the design process. The works included demolition of the internal structure, new partitions & ceilings, new finishes, internal doors, external windows and doors, re-roofing and a full mechanical and electrical installation.

New Girton Recreation Ground

West Range

Kings College, Wilkings Bar Job